Skip to main content

Cloud Migration

Move to the cloud without the horror stories.

Phased, validated migrations to AWS, Azure, or Google Cloud that cut infrastructure cost and modernize operations — with minimal downtime and no surprises.

Target minutes of unplanned downtime
0
Cloud platforms supported
3
Typical infrastructure cost reduction
20-30%

The problem

Migrations fail on the details no one planned for

Most migration horror stories aren't about the cloud platform — they're about dependencies no one mapped, cutovers with no rollback plan, and cost estimates that ignored data egress.

  • Undiscovered application dependencies break during cutover
  • No rollback plan turns a bad deployment into an extended outage
  • Lift-and-shift migrations carry legacy inefficiencies straight into the cloud bill
  • Security and compliance get bolted on after migration instead of designed in

The solution

Migrations planned like an engineering program, not a weekend project

We map dependencies before we touch anything, choose the right strategy per workload, and validate every cutover in parallel before traffic actually shifts.

01

Dependency-mapped

Nothing moves until we know what it depends on and what depends on it.

02

Workload-appropriate strategy

Rehost, replatform, or refactor — chosen per workload, not applied blindly.

03

Validated before cutover

Parallel-run testing catches issues before production traffic shifts.

Capabilities

What we deliver

End-to-end migration, not just a lift-and-shift.

Cloud readiness assessment

Workload audit and total-cost-of-ownership modeling.

Migration strategy

Rehost, replatform, or refactor decisions made per workload.

Infrastructure as code

Terraform and CloudFormation environments, not manual console setup.

CI/CD & DevOps enablement

Modern deployment pipelines from day one in the new environment.

Security hardening

Compliance-aligned configuration from the first deployment.

Post-migration optimization

Cost monitoring and right-sizing once workloads are live.

Technology

Technology we use

Vendor-neutral across all three major platforms.

Cloud platforms

  • AWS
  • Microsoft Azure
  • Google Cloud

Infrastructure as code

  • Terraform
  • CloudFormation

Containers & orchestration

  • Kubernetes
  • Docker

Architecture

How a migration is structured

Four phases between legacy infrastructure and a validated cloud estate.

01

Assess

Dependency mapping, cost modeling, and workload classification.

02

Plan

Target architecture and wave-by-wave migration sequencing.

03

Migrate

Rehost, replatform, or refactor executed per workload.

04

Validate & cut over

Parallel-run testing before production traffic shifts.

Use cases

Where we've applied this

Cross-industry

Data center exit

Full migration off owned infrastructure to the cloud.

Enterprise

Multi-cloud & hybrid architecture

Workloads split deliberately across providers or on-prem.

Software

Application modernization

Legacy apps re-platformed to containers and serverless.

Financial Services

Disaster recovery planning

Cloud-based DR replacing untested on-prem backup plans.

Process

How we deliver a migration

  1. 01

    Assess & model cost

    Map dependencies and model total cost of the target state.

  2. 02

    Design the plan

    Sequence migration waves by risk and business priority.

  3. 03

    Migrate & validate

    Execute per workload with parallel-run validation.

  4. 04

    Cut over & optimize

    Shift traffic, then tune cost and performance continuously.

Benefits

What a planned migration buys you

Lower cost

Right-sized infrastructure instead of a lift-and-shift of old inefficiencies.

Minimal downtime

Phased cutover with a tested rollback plan at every stage.

Modern operations

CI/CD and infrastructure as code from day one.

Audit-ready security

Hardening and compliance built in, not retrofitted.

FAQ

Frequently asked questions

It depends on your existing stack, compliance needs, and team expertise. We run a vendor-neutral assessment before recommending AWS, Azure, or GCP.

Ready to move without the horror stories?

Tell us what you're running today — we'll map the dependencies before we touch anything.